Scope of works was replacement of two existing cement mill shells CM2 Ø 2,2 x 13m and CM3 Ø 3 x 6m inside the existing mill building. Old mills dismantling and new mills installation was done using hauling tracks through mill building wall. Setting and alignment of new main drives was also part of the works scope.
Bratislavská 111
911 05 Trenčín
Slovakia
+421 908 723 167
tn@montazetrencin.sk