Filter reconstruction was divided into 3 phases.
Phase I – preassembly works on a preassembly table where 2 filter heads were pre-fabricated. Along with preassembly works, reinforcement of existing filter supporting steel structures were executed. Preassembly works in the volume of 97,5t.
Phase II – dismantling existing filter parts and related equipment
Phase III – installation of new filter parts in total volume of 170t