The contact form*
Please fill in all required fields
Send
Your message was successfuly sent
 
ENGLISH
 
Contacts
 
 

Beumer Group CZ

 
 
 
Project information
Customer:
Beumer Group CZ
Time of realization:
2013
Place of realization:
Cementa AB-Slite, Sweden
Industry branch:
Cement plants
Type and scope of work:
Installation of a clinker pipe conveyor system
 
 
 
Project description
  • Installation of supporting steel structures with a weight of 56.5 tons
  • Installation of conveyor bridges with a weight of 77.1 tons
  • Installation of conveying technology under silos and in the conveyor bridge and assembly of accessories
  • Conveyors with a total weight of 36 tons
  • Adjustment in position of the steel structure and technological equipment with a weight of 10 tons
Project information
Customer:
Beumer Group CZ
Time of realization:
2013
Place of realization:
Cementa AB-Slite, Sweden
Industry branch:
Cement plants
Type and scope of work:
Installation of a clinker pipe conveyor system
Contact us:
MONTÁŽE Trenčín a.s.

Bratislavská 111
911 05 Trenčín
Slovakia

+421 908 723 167

tn@montazetrencin.sk